Integrating line planning, timetabling, and vehicle scheduling: a customer-oriented heuristic

2009 | journal article. A publication with affiliation to the University of Göttingen.

Jump to: Cite & Linked | Documents & Media | Details | Version history

Cite this publication

​Integrating line planning, timetabling, and vehicle scheduling: a customer-oriented heuristic​
Michaelis, M. & Schöbel, A.​ (2009) 
Public Transport1(3)-232​.​ DOI: https://doi.org/10.1007/s12469-009-0014-9 

Documents & Media

12469_2009_Article_14.pdf736.18 kBAdobe PDF

License

Published Version

Special user license Goescholar License

Details

Authors
Michaelis, Mathias; Schöbel, Anita
Abstract
Given an existing public transportation network, the classic planning process in public transportation is as follows: In a first step, the lines are designed; in a second step a timetable is calculated and finally the vehicle and crew schedules are planned. The drawback of this sequence is that the main factors for the costs (i.e. the number of vehicles and drivers needed) are only determined in a late stage of the planning process.
Issue Date
2009
Publisher
Springer
Journal
Public Transport 

Reference

Citations


Social Media